KENISWCS

Real-time floor performance, hour by hour

KENIS Reporting & Analytics compares UCH, the cases your floor is actually moving each hour, with RCH, the cases per hour required to finish the plan on time, so supervisors know where the shift stands and act before cutoffs slip.

  1. WMS plan
  2. WCS actuals
  3. UCH vs RCH
  4. Action

Sample dashboard

A live view of the shift

This sample dashboard uses simulated data to show what supervisors see: the current hour building up, the required rate moving with the plan, and the zones falling behind.

Floor dashboard

Shift 1 · 06:00–14:00

11:24Live · sample data

UCH · actual

6,303

cases per hour, current hour

RCH · required

5,992

cases per hour to finish the plan

Attainment

105%

On pace

Projected finish

13:52

before 14:00 shift end

Cases per hour

UCHRCH
06
07
08
09
10
11
12
13

Current hour: 2,521 cases so far, pacing to 6,303.

By zone

  • Receiving1,222 / 1,079 113%
  • Put-away & AS/RS1,015 / 959 106%
  • Picking1,451 / 1,438 101%
  • Packing905 / 839 108%
  • Sortation882 / 959 92%
  • Shipping749 / 719 104%

UCH / RCH per zone, cases per hour.

Sample floor dashboard with simulated data comparing actual cases per hour (UCH) with required cases per hour (RCH) by hour and by zone.

Key measures

Two numbers that run the shift

UCH tells you what the floor is doing. RCH tells you what it needs to do. Together they show whether today's plan will be met.

UCH

Units/Cases per Hour

The actual throughput: cases confirmed by WCS scans, diverts, and task completions in the last hour.

RCH

Required Cases per Hour

The target rate: remaining planned cases from the WMS divided by the hours left before shift end or carrier cutoff. It updates as the shift progresses.

UCH ÷ RCH

Attainment

Whether the floor is ahead of or behind plan right now. Below 100% means the shift will miss its target unless something changes.

ETA

Projected finish

When the remaining volume will be done at the current UCH, compared with the shift end and cutoff times.

Views

Drill from the shift down to a single zone

  • By hour

    Hourly UCH against RCH across the shift, with the current hour updating in real time.

  • By zone and process

    Receiving, put-away, picking, packing, sortation, and shipping, each with its own UCH and RCH.

  • By equipment

    Conveyor, sorter, AS/RS, and robot throughput, with downtime and fault impact on rate.

  • By wave and cutoff

    Required rates for each wave, order priority, and carrier cutoff, so the most urgent work comes first.

Data sources

Built on the data you already have

  • WMS

    Planned volume, waves, orders, priorities, and cutoffs

  • WCS

    Scans, task confirmations, diverts, and induct counts

  • Equipment

    Status, faults, and downtime from PLCs and controls

  • KENIS Platform

    Workflow events, exceptions, and message health

Features

Reporting built for daily floor operations

Live dashboards

Floor-ready screens for supervisors and team leads, refreshed continuously from WMS and WCS events.

Rate alerts

Notify the right lead when UCH drops below RCH for a zone, an hour, or a cutoff.

Shift and daily reports

Automatic end-of-shift and daily summaries of UCH, RCH, attainment, and exceptions.

Trends and history

Compare shifts, days, and sites to find recurring slow hours and process bottlenecks.

Role-based views

Floor detail for supervisors, site summaries for managers, and multi-site rollups for leadership.

Export to BI

Share curated KPI data with your existing BI and reporting tools.

Who uses it

  • Floor supervisors rebalance labor and equipment during the hour
  • Operations managers track attainment across shifts and zones
  • Leadership compares performance across sites and days
  • Support teams see when system issues are slowing the floor

Ready to integrate your warehouse stack?

Tell us about your WMS, WCS, and automation goals. We will help you find the right approach.

Talk with us